Thursday, June 30, 2011

Drainage!

June was a wet month for Wakonda. We received a total of 9.5 inches of rain with 5.5 inches on June 8 & 9.  It has been a wet beginning to the 2011 season- we have received more than 20 inches of rain since April 1st.

We are taking advantage of the drier weather this week by tackling a drainage project on holes 12 & 13.  

Jaret Vasey operates our trencher on the left side of 12 fairway.
Intern Jason Conrad is prepping a trench for pipe.
The process is labor intensive but will have a tremendous impact in playability.  Other areas we would like to install additional drain pipe include fairways 3, 5, and 8.  Hopefully we will have weather favorable for drainage work so we can address theses areas before turf health declines.

The type of drainage we are installing is a corrective measure for excess ground water and is not necessarily part of the drainage master plan which was completed last fall by Turf Drainage Co.  This consultant focused primarily on upgrades which would better handle surface runoff from surrounding areas during major rain events.